top of page
Energy Consultancy | Wellhead to Global LNG, Sustainability and AI


Re-Thinking Black Start: Can BESS Anchor ERCOT’s Next Grid Restoration?
Source: TESLA After Winter Storm Uri, Texas learned the hard way that its grid restoration system needs a reboot. Over 80% of ERCOT’s Black Start units failed during the 2021 freeze, exposing weaknesses in a system built around fossil generation. Now ERCOT and FERC are exploring whether Battery Energy Storage Systems (BESS) can help restart the grid after a blackout—using fast-acting, inverter-based batteries to energize substations and transmission corridors. Advantages Inst

Timothy Beggans
Nov 41 min read


Will Data Centers and LNG Export Facilities Rewrite the Natural Gas Pipeline Flow Patterns?
Source: https://www.datacentermap.com/usa/ The U.S. natural gas grid is being reshaped by two powerful new demand drivers: AI data...

Timothy Beggans
Oct 91 min read
bottom of page





